The design and erection of complete skids is an Icon Specialty.  The skids can be completely piped and prewired with all valves, instrumentation and controls in place on the skid. They enable large Filtration and Ion Exchange plants to be delivered directly to site and positioned the same day, with only termination points and off skid wiring to be completed on site.

It is also normal to load the media on site due to the excess weight for normal transport.

1